concrete panels are laid as a temporary path towards the drained pond. Mud removal will be performed using an excavator and heavy transport equipment
ID: 2036936429
编辑图片
以图搜图
- 大图:3504 × 2250 像素·29.67 cm × 19.05 cm·300dpi·JPG
- 中图:1000 × 642 像素·35.28 cm × 22.65 cm·72dpi·JPG
- 小图:500 × 321 像素·17.64 cm × 11.32 cm·72dpi·JPG