以图搜图
The process of installing the air preheater element in a coal fired steam power plant by several workers
ID: 2369062279
预览
版权Boledong
TIFF大小
29.9MB
格式JPG
编辑图片
以图搜图
  • 大图:2801 × 3735 像素·23.72 cm × 31.62 cm·300dpi·JPG
  • 中图:750 × 1000 像素·26.46 cm × 35.28 cm·72dpi·JPG
  • 小图:375 × 500 像素·13.23 cm × 17.64 cm·72dpi·JPG