以图搜图
Barry dock regeneration: the old rail tracks run behind the latest phase of new houses at East Quay. The site is on the perimeter of the industrial sites next to number 2 dock and the port of Barry.
ID: 2421733395
预览
TIFF大小
58MB
格式JPG
编辑图片
以图搜图
  • 大图:6000 × 3376 像素·50.8 cm × 28.58 cm·300dpi·JPG
  • 中图:1000 × 563 像素·35.28 cm × 19.86 cm·72dpi·JPG
  • 小图:500 × 282 像素·17.64 cm × 9.95 cm·72dpi·JPG